TEAM 1580 - Process Capstone Project Credits: 2 This course will require the identification and use of required hardware to build and setup a functional industry system for flow and level control of fluid such as water. The system must meet the stated criteria for flow/level measurement and control. The system will consist of reservoir tanks and industrial control instrumentation such as PID Controllers, Flow Transmitters, and level sensors. It is recommended that students complete TEAM 1050 & TEAM 1520 prior to taking this course.
Semester: All
Click here for searchable class schedule
Add to Portfolio (opens a new window)
|